Central Railway Mumbai Division will operate Mega Block over Central Railway on 18.2.2024

0

 

Mumbai: Central Railway Mumbai Division will operate Mega Block on its suburban sections carrying out various engineering and maintenance works on 18.2.2024 as under:

Thane-Kalyan Up and Down Fast lines from 10.40 am to 3.40 pm

Down Fast/Semi-Fast local services departing CSMT Mumbai from 09.30 am to 2.45 pm will be diverted on Down Slow line between Thane and Kalyan stations halting at Kalva, Mumbra and Diva stations in addition to their respective halts and will arrive at destinations 10 minutes later than their scheduled arrival.

Up Fast/Semi-fast services departing Kalyan from 10.28 am to 03.25 pm will be diverted on Up Slow line between Kalyan and Thane stations halting at Diva, Mumbra and Kalva stations in addition to their respective halts and further re-diverted on Up Fast line at Mulund station and will arrive at destinations 10 minutes later than their scheduled arrival.

Down Mail/Express trains departing CSMT/Dadar will be diverted on 5th line between Thane and Kalyan stations.
Up Mail/Express trains arriving CSMT/Dadar will be diverted on 6th line between Kalyan and Thane/ Vikhroli stations.

CSMT Mumbai-Chunabhatti/Bandra Down Harbour line from 11.40 am to 4.40 pm &
Chunabhatti/Bandra-CSMT Mumbai Up Harbour line from 11.10 am to 4.10 pm

Down Harbour line services to Vashi/Belapur/Panvel departing CSMT Mumbai from 11.16 am to 4.47 pm and Down Harbour line services to Bandra/Goregaon leaving CSMT Mumbai from 10.48 am to 4.43 pm will remain suspended.

Up Harbour line services for CSMT Mumbai departing Panvel/Belapur/Vashi from 9.53 am to 3.20 pm and Up Harbour line services for CSMT Mumbai departing Goregaon/Bandra from 10.45 am to 5.13 pm will remain suspended.

However, special services will run between Panvel and Kurla (Platform No.8) at a frequency of 20 minutes during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

About Author

error: Content is protected !!

Maintain by Designwell Infotech