Mumbai: CR Mega Block on 31.1.2021 (Sunday). Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on Sunday 31.1.2021.
MAIN LINE
Byculla – Matunga Up and Dn fast lines from 11.05 am to 4.05 pm
Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus from 10.49 am to 3.44 pm will be diverted on Dn slow line between Byculla and Matunga halting as per respective scheduled halts; re-diverted on Dn fast line at Matunga and will arrive destination 15 minutes beyond schedule.
Up fast line services leaving Kurla from 11.06 am to 3.45 pm will be diverted on Up slow line between Matunga and Byculla, halting as per respective scheduled halts; rediverted on Up fast line at Byculla and will arrive destination 15 minutes beyond schedule .
HARBOUR LINE
Kurla-Vashi Up & Dn harbour lines from 11.10 am to 4.10 pm
Dn services to Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Maharaj Terminus from 10.18 am to 3.39 pm will remain cancelled.
Up services to Chhatrapati Shivaji Maharaj Terminus leaving Panvel/Belapur/Vashi from 10.21 am to 3.41 pm will remain cancelled.
Special trains will be run on Chhatrapati Shivaji Maharaj Terminus-Kurla section during the block period.
Harbour line passengers are permitted to travel via Transharbour line / Main line from 10.00 am to 4.30 pm
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.