MEGA BLOCK ON 04.12.2016

1

Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on 04.12.2016:
KALYAN -THANE UP SLOW LINE FROM 11.15 AM TO 3.45 PM

Up Slow / Semi – fast services leaving Kalyan from 10.47 am to 3.39 pm will be diverted on UP fast line between Kalyan and Mulund stations and on proper Up Slow line from Mulund station.

Dn fast services leaving Chhatrapati Shivaji Terminus Mumbai from 10.08 am to 2.42 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.

Up fast line services leaving Thane from 10.46 am to 3.26 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.
Dn / Up slow locals leaving / arriving Chhatrapati Shivaji Terminus Mumbai between 12.00 hrs. to 5.00 pm and will arrive destination 10 minutes behind schedule.

Up slow local line services will not available at Thakurli, Kopar, Diva, Mumbra and Kalva stations. Passengers’ of these stations are permitted to travel via Dombivli and Thane stations

Due to these blocks, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling. They are also requested to avoid travelling on foot board, roof top of locals and not to board extremely over crowded trains. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Share.

About Author

Maintain by Designwell Infotech