CR Mega Block on 7.3.2021 (Sunday)

0

Mumbai: CR Mega Block on 7.3.2021 (Sunday). Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on Sunday 7.3.2021.

Main Line
Chhatrapati Shivaji Maharaj Terminus and Vidyavihar Up and Dn slow lines
from 10.55 am to 3.55 pm

Dn slow services leaving Chhatrapati Shivaji Maharaj Terminus from 10.48 am to 3.36 pm will be diverted on Dn fast line between Chhatrapati Shivaji Maharaj Terminus and Vidyavihar stations, skipping the halt at Masjid, Sandhurst Road, Chinchpokli, Curry Road, Vidyavihar and further rediverted on Dn slow line proper.

Up slow services leaving Ghatkopar from 10.40 am to 3.52 pm will be diverted on Up fast line between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus skipping halt at Vidyavihar, Currey Road, Chinchpokli, Sandhurst Road and Masjid.

Services will not be available at Masjid, Sandhurst Road, Chinchpokli, Curry Road and Vidyavihar during the block period.

Share.

About Author

Maintain by Designwell Infotech